Audit and split monolithic Compose Screen files in the NutriSport KMP project before they become unmanageable. Use when a Screen file feels too long, when you see warnings like "DetailsScreen.kt is 568 lines", when the user says "split this Screen", "розпиляй екран", "decompose composable file", "екран став некерованим", "audit screen size", "файл занадто довгий", "extract sections from this Screen", or after the feature pipeline generates a new Screen ≥300 lines. Detects threshold breaches (lines, composable count, nesting, distinct UI concerns), proposes a project-conventional split that respects Route↔Screen contract, Preview discipline, :core: cross-feature rules, and :shared:ui design-system rules, then either reports (audit-only) or executes the refactor with compile + composition test verification. Always invoke this skill instead of free-handing a Screen split — it bakes in the project's split-point heuristics so the result lands in the right module first try.
EnglishDiscipline rules для Figma MCP на Pro-плані ($20: 10 calls/min, 200 calls/day). Prefer getdesigncontext, scope by nodeId, anti-runaway guard, no-retry on 429, behavioral session cache, per-screen interleaving (Rule 11). Activate before any series of Figma MCP calls — особливо bootstrap-сценарії, feature-pipeline runs з ≥5 screens, або довгі handoff-сесії. Triggers: "Figma MCP", "rate limit", "getdesigncontext", "getmetadata", "node-id", "figma file key", "Figma бюджет", "429", any sequence of mcpfigma-dev-mode calls.
EnglishWeekly review of infrastructure changes for the NutriSport portfolio docs. Activates on "/infra-weekly", "/infra-review", "weekly infra", "тижневий ревʼю інфри", "що ми зробили цього тижня в інфрі", or any time the user mentions Sunday review of infra wins. Scans the last 7 days of git commits, diff'd files in .claude/{hooks,skills,rules,settings}, gradle/libs.versions.toml, and build-logic/, then drafts portfolio entries against docs/infrastructure/templates/entry.md and updates docs/infrastructure/WEEKLYLOG.md. User work: ~15 minutes confirming and editing drafts.
EnglishIncludes Compose Screen Splitter, Figma MCP Budget, and Infra Weekly.
Supported by the Atlas install prompt. Skill-specific requirements vary.
Pack stats
What’s included
Compose Screen Splitter
Audit and split monolithic Compose Screen files in the NutriSport KMP project before they become unmanageable. Use when a Screen file feels too long, when you see warnings like "DetailsScreen.kt is 568 lines", when the user says "split this Screen", "розпиляй екран", "decompose composable file", "екран став некерованим", "audit screen size", "файл занадто довгий", "extract sections from this Screen", or after the feature pipeline generates a new Screen ≥300 lines. Detects threshold breaches (lines, composable count, nesting, distinct UI concerns), proposes a project-conventional split that respects Route↔Screen contract, Preview discipline, :core: cross-feature rules, and :shared:ui design-system rules, then either reports (audit-only) or executes the refactor with compile + composition test verification. Always invoke this skill instead of free-handing a Screen split — it bakes in the project's split-point heuristics so the result lands in the right module first try.
Figma MCP Budget
Discipline rules для Figma MCP на Pro-плані ($20: 10 calls/min, 200 calls/day). Prefer getdesigncontext, scope by nodeId, anti-runaway guard, no-retry on 429, behavioral session cache, per-screen interleaving (Rule 11). Activate before any series of Figma MCP calls — особливо bootstrap-сценарії, feature-pipeline runs з ≥5 screens, або довгі handoff-сесії. Triggers: "Figma MCP", "rate limit", "getdesigncontext", "getmetadata", "node-id", "figma file key", "Figma бюджет", "429", any sequence of mcpfigma-dev-mode calls.
Infra Weekly
Weekly review of infrastructure changes for the NutriSport portfolio docs. Activates on "/infra-weekly", "/infra-review", "weekly infra", "тижневий ревʼю інфри", "що ми зробили цього тижня в інфрі", or any time the user mentions Sunday review of infra wins. Scans the last 7 days of git commits, diff'd files in .claude/{hooks,skills,rules,settings}, gradle/libs.versions.toml, and build-logic/, then drafts portfolio entries against docs/infrastructure/templates/entry.md and updates docs/infrastructure/WEEKLYLOG.md. User work: ~15 minutes confirming and editing drafts.
Quick start
- Choose your skills. Select individual skills above, or choose the entire pack.
- Copy the install prompt. Use Copy install prompt above the list.
- Send it to your agent. Paste into your coding agent’s chat. Your agent reviews the source and guides the setup.
Try it with your agent
After installation, start with a request like:
Use the Compose Screen Splitter skill to help with my task.
Ask me for the context you need before getting started.Requirements & license
- A coding agent that can access your project files and install skills.
- Your agent checks each skill’s instructions, dependencies, and permissions during setup.
- Reported license for the skills shown: MIT. The author’s terms apply.