Senior power-engineer playbook for screening and mitigating the grid impact of a new generator, storage, or large-load interconnection. Use whenever the question is whether X MW can connect at a point of interconnection and what upgrades it needs. Triggers on "interconnection study", "system impact study", "POI", "can we connect this plant at bus Y", "short-circuit ratio", or "weak grid". Walks from steady-state screens through weak-grid and reactive checks to the binding constraint and its mitigation set.
Quick start
- Copy the install prompt. Use the green button above this README.
- Send it to your agent. Paste it into your coding agent’s chat and send.
- Review the setup. Your agent checks the skill’s instructions, requirements, and installation scope.
Review, license & listing details
This is an imported listing. We haven’t certified its safety, license, or compatibility. Skills may include executable scripts.
Only SKILL.md was scanned. Supporting files and scripts were not checked. No safety grade has been assigned.
0 potential findings · Scanned 11/4/2026 · Scanner 0.2.1
Content SHA-256: c0f8dc8e232e628d497f203250929952e72078a06175e72dd0c4ae57e0ff6fa6
About this listing
- Category
- Developer tools
- Reported license
- Not specified
- Listing language (estimated)
- English
- Review status
- Not individually reviewed
- Agent compatibility
- Atlas installation supports Claude Code, Codex, and Cursor. Skill-specific dependencies and features are checked during setup.