About this skill
Use when a task needs the judgment of an electrician's helper — running the NEC box-fill or conduit-fill calculation for a rough-in before wire gets pulled, bending conduit and pulling wire without exceeding practical bend/tension limits, running a non-contact continuity or polarity check at trim-out, or recognizing when a jobsite finding (reversed polarity, an undersized box, an unlabeled abandoned circuit) is a stop rather than a workaround.
Quick start
- Copy the install prompt. Use the green button above this README.
- Send it to your agent. Paste it into your coding agent’s chat and send.
- Review the setup. Your agent checks the skill’s instructions, requirements, and installation scope.
Review, license & listing details
This is an imported listing. We haven’t certified its safety, license, or compatibility. Skills may include executable scripts.
Only SKILL.md was scanned. Supporting files and scripts were not checked. No safety grade has been assigned.
0 potential findings · Scanned 11/4/2026 · Scanner 0.2.1
Content SHA-256: da18f101ff930a175449d0b0c30a496520df21a5743ac2b75ff72619e33055c9
About this listing
- Category
- General
- Reported license
- MIT
- Listing language (estimated)
- English
- Review status
- Not individually reviewed
- Agent compatibility
- Atlas installation supports Claude Code, Codex, and Cursor. Skill-specific dependencies and features are checked during setup.