About this skill
Phase-gate prerequisite enforcement. Verifies that Phase N-1's gate-evaluator emitted PROMOTE before any Phase N agent operates. Special handling for the wait period between Phase 4 (T0 baseline) and Phase 5 (T1 + analysis): Phase 5 cannot begin before the pre-registered wait window has elapsed.
Quick start
- Copy the install prompt. Use the green button above this README.
- Send it to your agent. Paste it into your coding agent’s chat and send.
- Review the setup. Your agent checks the skill’s instructions, requirements, and installation scope.
Review, license & listing details
This is an imported listing. We haven’t certified its safety, license, or compatibility. Skills may include executable scripts.
Only SKILL.md was scanned. Supporting files and scripts were not checked. No safety grade has been assigned.
0 potential findings · Scanned 11/3/2026 · Scanner 0.2.1
Content SHA-256: 108f0b786af01ff3180a1ecb452c246d6b59cf5101a758d0a134060af60fd4f4
About this listing
- Category
- General
- Reported license
- Not specified
- Listing language (estimated)
- English
- Review status
- Not individually reviewed
- Agent compatibility
- Atlas installation supports Claude Code, Codex, and Cursor. Skill-specific dependencies and features are checked during setup.